Merge branch 'Development' into config_testing
Latest upstream changes
This commit is contained in:
		| @@ -228,6 +228,8 @@ Here are some standard links for getting your machine calibrated: | ||||
| // to increase the heat up rate. However, if changed, user must be aware of the safety concerns | ||||
| // of drawing too much current from the power supply. | ||||
|  | ||||
| //#define PID_BED_DEBUG // Sends debug data to the serial port. | ||||
|  | ||||
| #ifdef PIDTEMPBED | ||||
| //120v 250W silicone heater into 4mm borosilicate (MendelMax 1.5+) | ||||
| //from FOPDT model - kp=.39 Tp=405 Tdead=66, Tc set to 79.2, aggressive factor of .15 (vs .1, 1, 10) | ||||
|   | ||||
		Reference in New Issue
	
	Block a user