New Feature: Z_DUAL_ENDSTOPS
Z_DUAL_ENDSTOPS is a feature to enable the use of 2 endstops for both Z steppers - Let's call them Z stepper and Z2 stepper. That way the machine is capable to align the bed during home, since both Z steppers are homed. There is also an implementation of M666 (software endstops adjustment) to this feature. After Z homing, this adjustment is applied to just one of the steppers in order to align the bed. One just need to home the Z axis and measure the distance difference between both Z axis and apply the math: Z adjust = Z - Z2. If the Z stepper axis is closer to the bed, the measure Z > Z2 (yes, it is.. think about it) and the Z adjust would be positive. Play a little bit with small adjustments (0.5mm) and check the behaviour. The M119 (endstops report) will start reporting the Z2 Endstop as well.
This commit is contained in:
@ -128,6 +128,7 @@
|
||||
#define MSG_Y_MAX "y_max: "
|
||||
#define MSG_Z_MIN "z_min: "
|
||||
#define MSG_Z_MAX "z_max: "
|
||||
#define MSG_Z2_MAX "z2_max: "
|
||||
#define MSG_M119_REPORT "Reporting endstop status"
|
||||
#define MSG_ENDSTOP_HIT "TRIGGERED"
|
||||
#define MSG_ENDSTOP_OPEN "open"
|
||||
|
Reference in New Issue
Block a user